Grid capacity and constraints
DNO capacity constraints are limiting consented site sizes and adding cost to new connections. Sites that model their energy demand early can design around the grid — not be blocked by it.
ContactIntegrated energy system design for residential and mixed-use developments facing grid constraints, planning requirements and increasing electrical demand. Get involved at feasibility — not after planning consent.

DNO capacity constraints are limiting consented site sizes and adding cost to new connections. Sites that model their energy demand early can design around the grid — not be blocked by it.
Grid reinforcement, substation upgrades and off-site works are rising rapidly in both cost and programme. On-site generation and storage can eliminate or substantially reduce these requirements.

Whole-site energy demand modelling at feasibility stage. Load forecasting across all dwelling types, communal areas and EV infrastructure. Strategy report suitable for planning submission.
Energy demand modelling, grid capacity review, renewable strategy and planning alignment. Output: strategy report and indicative cost plan.
Technical design developed alongside architect, structural and M&E. Plant room spatial coordination, roof loading, penetrations and service routes agreed.
DNO application submitted and managed. Installation programme agreed with main contractor. In-roof and BIPV coordinated with building envelope programme.
System commissioning, DNO sign-off, EMS configuration and handover to building manager. Full O&M documentation and MCS certification.
Live monitoring against modelled yield. Battery scheduling review, demand response enrolment and generation performance reporting to site manager.
The cost of late energy design is programme delay, planning conditions and infrastructure spend that could have been avoided. The earlier we are involved, the more options are available — and the lower the overall project cost.